PNEUMATIC MANEUVERING SYSTEM SYSTEM SERVICE REPORT

PNEUMATIC MANEUVERING SYSTEM SYSTEM SERVICE REPORT
30 Mar 21

PNEUMATIC MANEUVERING SYSTEM SYSTEM SERVICE REPORT

                                                                                           


Service Report


MAIN ENGINE PNEUMATIC MAVOEUVRING SYSTEM OVERHAUL

STARTING AIR DISTRIBUTOR OVERHAUL

MAIN STARTING VALVE/SLOW TURNING VALVE/ACTUATORS


M/T TAMZARA

TAMZARA TANKERS





 29 October 2020 





Vessel/plant      : TAMZARA
Engine Builder      : HYUNDAI-MAN B&W
IMO                       :
Engine Type           : 6S70MC-C
Customer             : Tamzara Tankers
Engine No               :
Period                   : 23.09.2020-17.10.2020
Running hours      :


Location              : TERSAN SHIPYARD /YALOVA/TURKEY
Reason for visit : Main Engine Pneumatic Manoeuvring System Overhaul
Author                  : Cengiz KUTUKCU




As requested, our service team has attended to vessel to carry out main engine pneumatic manoeuvring system O/H with VITA supplied spares while vessel docked at Tersan Shipyard/Yalova/Turkey.


Total 53 pcs components in the pneumatic manoeuvring system overhauled/replaced…


General condition of the pneumatic component found in poor condition. Corrosion observed internal parts of the Pos.33, same replaced with complete valve, the old one of the Pos.33 overhauled and delivered to vessel for emergency use.


As you can see from the pictures there was excessive limestone on the pneumatic valves caused by water in the control air, same cleaned from the valves and tried to blow air line as feasible as possible, however there is always risk of blockage of orifices or similar narrowed access from the same particles coming from the air line.


Used repair kits and valves packed and delivered to ship crew for emergency use in case needed. Upon completing of the job, engine simulation tests completed and found in good order.

Below you can find list of the components overhauled.


 

 



   


 


 


 


 


 


 


 


 


 


 


 


 


 


 


  


 


 


 




Piston units of starting air distributor removed, inspected and cleaned.




 


  


 


 


 


 


 


 Main starting valve and actuator - slow turning valve and acuator ovehauled.

    


    


   


   


   


   


  



   1.    General condition of the component indicates that air quality on the control & safety system very poor, recommend maintain good quality control air in the future.

  2.   Recommend to keep planned maintenance of the system as per MAN B&W service letter SL01-394.

  3. Recommend to carry out regular check for starting air distributor as per MAN B&W service letter SL03-415 to prevent sudden engine starting failure.

  4. Recommend carry out reversing cylinder health check according to guidance prepared by Vita Engineering.

      Guidance can be downloaded from experience share section of our web page 
www.vitatr.com


      

     